Frequently Asked Questions
Does there exist a minimum or maximum duration of a project?
Posted by EuroRIs-Net Administrator on 14 October 2008 09:48 AM
|
|
Integrated Infrastructure Initiative (I3) projects are expected to last typically two to four years. However, there is no formal minimum or maximum duration. | |
|
Comments (0)